What do I need to pay attention to for rack installation?

Aug 04, 2017

Leave a message

1, the general installation and acceptance of the shelves, to ensure quality and safety, promote technological progress, improve economic efficiency, the formulation of this code.

2, the installation of shelves should be according to the map construction. When the site or design is found to be in place, it should be put forward in time, after the change of approval can be construction.

3, the installation of the shelves of a variety of measurement and testing instruments, instruments, instruments and equipment should be in line with the state of the current regulations, the accuracy of the level is not lower than the accuracy of the installation requirements.

Send Inquiry